Srons Engineers are manufacturers and exporters of Double Corrosion Protection Anchors / DCP Bolts in India, Punjab Ludhiana.
Double corrosion anchor required which has following properties/components:
- Anchor Length: Total Anchor length -Free length + Fixed Length + Stressing Tail Length
- Fixed Length: To be designed
- Free length: To be designed
- Stressing Tail Length: To be designed
- Anchor Main Bar Dia: 32mm
- Bar Grade: 950/1050
- Corrosion Requirements: Double Corrosion Protection
SRONS Solutions: We manufacture & Supply Double corrosion anchor required which has following properties/components:
Material | Fixed Length in RM | Free Length in RM | Stressing Tail Length in RM |
32mm FT bar Anchor incl Stressing Length | To be designed | To be designed | To be designed |
Material
- Inner Corrugated HDPE/PVC Corrugated Tube
- Outer Debonding Smooth Tube
- Inner Centralizer Fixed Length
- Inner Centralizer Free Length
- Outer Centralizer Fixed Length
- Outer Centralizer Free Length
- Coupler for 32mm
- Anchor End Cap
- Spherical Hex Nut
- Protective Cap on Anchor Head
- Grout Tube
- Steel Anchor Plate
- 32mm Dia FT Bar in Grade 950/105
- Inner Grouting
Fully Threaded Bar |
||
Properties | Unit Of measurement | Value |
Nominal Outer Diameter | mm | 32 |
Cross Sectional Area | mm2 | 804 |
Nominal Mass per meter | Kg | 6.53 |
Yield Strength | Mpa | 950 |
Ultimate Strength | Mpa | 1050 |
Characteristic breaking load | kN | 845 |
Max. initial stressing force | kN | 676 |
Max. overstressing force | kN | 722 |
Coupler |
||
Properties | Unit Of measurement | Value |
Nominal Outer Diameter | mm | 60 |
Length | Mm | 160 |
Inner Diameter | Mm | 32.5 |
Material Grade | Mpa | 950/1050 |
Nominal Wt./Pc | Kg | 2.45 |
Dome Nut |
||
Properties | Unit Of measurement | Value |
Nominal Outer Diameter | mm | 60 |
Length | Mm | 50 |
Inner Diameter | Mm | 58 |
Material Grade | Mpa | 950/1050 |
Nominal Wt./Pc | Kg | 1.40 |
Plate |
||
Properties | Unit Of measurement | Value |
Width | mm | 180 |
Length | Mm | 180 |
Thickness | Mm | 40 |
Detailed procedure will be sent to client along with shipping documents.
(1) Anchors Reception
- Check all anchors and components for possible transportation damage.
- Do not use anchors that have been bent or that have any surface damage.
- Do not use bars as ground for welding, do not allow hot slag to touch the bars, and do not weld to bars.
- Handle anchors with care using nylon lifting slings. The bars must not be dropped, thrown or dragged.
- Upon unloading, protect the bars from dirt and mechanical damage.
(2) DCP couplers in the bond and free lengths.
- Grease both bar ends thoroughly.
- Install coupler, bar ends must be centered inside coupler.
- Torque bar against each other
- Grease coupler thoroughly.
- Install heat-shrink sleeve.
- Important: do not burn the heat shrink sleeve nor the plastic sheathing.
(3) Grout tube and outer centralize assembly.
- Install outer centralizers within the bond length using adhesive tape and / or wire at the required spacing.
- If applicable, install grout tube using adhesive tape. The grout tube must start 50 to 100mm from the bottom of the anchor and extend at least 1 meter above the anchor head.
(4) Inserting the anchor into the borehole
- If necessary, water-test the borehole according to the project specifications.
- Using a lifting eye or another equivalent attachment, lift the anchor from the achor head end, important do not drag.
- Insert the anchor into the borehole gradually making sure that it does not get damaged.
(5) Grouting of the anchor, installation of the trumpet & anchor nut
- Ensure that the anchor is centered in the borehole.
- Leave enough bar protruding behind the plate for the anchor nut and the stressing coupler (typically 500mm).
- Also ensure that there is sufficient bare bar inside the sealing tube of the trumpet to allow for free movement during tensioning of the anchor (typically 150mm).
- Grout the entire anchor is one stage according to the product specifications.
- While the grout is still wet, wash out 1.0 meter below the location of the anchor plate.
- Install the trumpet pre-filled with anti-corrosion compound over the bar, ensure the sealing tube is correctly engaged over the smooth pipe (bondbreaker) and the sealing ring of the corrugated pipe.
- Fasten anchor nut tight against the bearing plate.
(6) Testing and Stressing
- Once the grout reached its required compressive strength, stress the bar according to project specifactions and contract drawings.
(7) Protective caps installation.
- Pre-fill the cap with anti-corrosion compound.
- Install it over the anchor nut with corresponding seal (O-ring).
- Bolt the cap onto the trumpet (3 screws).
- Full-fill any residual gap with anit-corrosion compound through the injection hole.
- Seal the injection hole with the end-cap plug.